Stay up to date with the latest news
Subscribe to our telegram channel
The bridge is 1,412 metres above sea level.
The new 223-km-long Toshguzar-Boysun-Qumqorgon railway line links the Qashqadaryo and Surkhondaryo regions with central Tashkent and other regions bypassing Turkmenistan.
The project cost of the new railway line is US$447 million, including US$151.47 million soft loans from the Japan Bank for International Cooperation.