Stay up to date with the latest news
Subscribe to our telegram channel
According to UzA, about 2.4 billion soums were directed to reconstruction of the building of the theatre. Construction-repair works were conducted by private enterprise Hosil-2001.
All conditions were created for spectators in theatre hall and lobby. The hall and scene were equipped with modern light and voice equipment. The territory around the theatre was improved.