Currency rates from 20/09/2024
$1 – 12724.84
UZS – -0.12%
€1 – 14223.83
UZS – 0.23%
₽1 – 137.11
UZS – -1.46%
Search
Economy 07/07/2024 Ministry of Energy: Angren TPP is operating normally
Ministry of Energy: Angren TPP is operating normally

Tashkent, Uzbekistan (UzDaily.com) -- The Ministry of Energy of Uzbekistan has denied reports circulating on social media about a fire at the Angren Thermal Power Plant (TPP).

The ministry emphasized that the information about a fire at the Angren TPP is false.

According to the Ministry of Energy, the power plant is operating normally.

Stay up to date with the latest news
Subscribe to our telegram channel