Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) -- Based on the results of the first stage of construction and installation work of the overpass connecting Babur Street with Tashkent International Airport, a successful test was carried out.
This test involved loading four military tanks, each weighing about 40 tons, onto four vehicle trailers, each weighing about 35 tons. Thus, the total load on the overpass was 300 tons
The test results confirmed that the overpass withstood this load, which exceeded the permissible load during operation, demonstrating its strength.